Most AI projects don't stall on the model. They stall on a missing owner, data nobody trusts, or no way to tell whether the thing works. This checklist is the 31 questions we ask before we build anything, grouped into seven areas, with what a good answer looks like and a simple way to score yourself.

B

Brillnex Systems

November 23, 2026·13 min read
Brillnex Systems blog cover: AI readiness checklist. 31 questions in seven areas to answer before you fund an AI project.

The short answer

What is an AI readiness checklist? It's a list of questions you answer before you pay for an AI project, to find out whether it has what it needs to work: a clear problem, usable data, systems it can connect to, someone who owns it, a way to test it, rules it must follow and a cost you can live with.

This one has 31 questions in seven areas:

  1. Problem and value: what you're fixing, and how you'll know it worked
  2. Data and knowledge: what the AI will read, and whether it's right
  3. Systems and integration: what it connects to, and what happens when those systems fail
  4. People and ownership: who owns it, reviews it and picks up what it can't handle
  5. Testing and quality: how you'll prove it works before and after launch
  6. Risk and compliance: the laws and rules it has to follow where you operate
  7. Cost and operations: what it costs per task, and who's watching

Answer each one Yes, Partly or No. Two areas are deal-breakers: if nobody owns the project, or you have no way to test it, stop and fix that first. The scoring section below explains the rest.

Why readiness decides more than the model does

The surveys agree on one thing: the organisations that get AI into production aren't the ones with the cleverest models. They're the ones that prepared.

  • Cisco AI Readiness Index, October 2025. A survey of 8,000 senior IT and business leaders at organisations with more than 500 employees, across 30 markets and 26 industries. About 13% qualified as "Pacesetters", the most prepared group, and that share has barely moved in three years. Pacesetters were 4 times more likely to move pilots into production and 50% more likely to see measurable value (Cisco newsroom, 14 October 2025). Cisco also reported that 64% of respondents struggle to centralise their data.
  • Deloitte, State of AI in the Enterprise, January 2026. 3,235 business and IT leaders in 24 countries, surveyed in August and September 2025. Only 25% had moved 40% or more of their AI pilots into production. Only 21% of companies planning to use AI agents reported a mature model for governing them (Deloitte, 21 January 2026).
  • Wing VC, State of AI in the Enterprise, January 2026. 181 C-level executives, surveyed in October 2025. Among large enterprises, the biggest barriers to production were integration (50%) and data (49%) (Wing VC).
  • LangChain, State of Agent Engineering, June 2026. 1,340 practitioners. The most-cited barrier was quality, at about a third of respondents, and only 52.4% ran offline evaluations, meaning tests against a fixed set of cases before shipping (LangChain).

Two caveats. These are surveys, mostly of large organisations, and "readiness" in a 5,000-person company isn't the same as in a 30-person one. We've written the checklist so it works at both sizes. And you'll often see a Gartner prediction quoted alongside these, that organisations will abandon 60% of AI projects that lack "AI-ready data". Gartner's press release blocks automated readers, so we couldn't check its exact wording and haven't relied on it here.

The checklist

Each table gives the question, what a good answer looks like, and the red flag that means "not yet". To use it as a template, copy the tables into a spreadsheet and add three columns: Answer (Yes / Partly / No), Evidence (a link or a name) and Owner.

1. Problem and value (5 questions)

#QuestionA good answer looks likeRed flag
1Which specific task or process will AI change?"Answering pre-sale questions on our website out of hours""We want to use AI"
2What does that task cost today, in time or money?A number you've measured, even roughly: hours a week, enquiries lost, cost per caseNobody knows; there's no baseline
3Who benefits, and will they use it?A named team or customer group that has asked for itIt's being built for people who haven't been asked
4What does "working" mean, as a number?"80% of test questions answered correctly, and every unanswerable one handed to a person""It should feel helpful"
5What happens when it gets something wrong?You've named the worst realistic mistake and what limits the damageNobody has asked

Question 2 is the one most often skipped, and it's the one you need later. Without a baseline you can't show the project paid off, and you can't tell a good result from a bad one.

2. Data and knowledge (5 questions)

#QuestionA good answer looks likeRed flag
6Where does the information the AI needs actually live?A list: the website, a policy folder, the product database, the CRM"It's all in people's heads"
7Who owns each source and keeps it up to date?A named person per source, with a habit of updating itSources nobody has touched in a year
8When two sources disagree, which one wins?A written rule, such as "the live price list beats any uploaded PDF"Nobody has thought about it
9What is the AI allowed to see, and what must it never see?Personal and confidential data identified, with a reason for each item it can accessFull access "to make it smarter"
10Can you pull together 20 real examples of the task?Real questions, cases or documents, with the right answer for eachOnly made-up examples

We learned question 8 the hard way. In ConGreeto, our own website assistant product, an old uploaded file kept giving visitors out-of-date prices after the website had been updated, because uploaded documents were trusted over the website. The fix wasn't a better model. It was a decision about which source is authoritative, and a way for the owner to see and remove stale content. If your AI will read your website, check that it can actually read all of it: on sites built with JavaScript frameworks, a basic crawler may only see the home page. We've written about building a chatbot knowledge base from a website crawl.

3. Systems and integration (4 questions)

#QuestionA good answer looks likeRed flag
11Which systems will it read from, and which will it write to?A short list, with read and write kept separate"Everything"
12Do those systems have a documented way in, such as an API or an export?Yes, and someone has tested itIt means screen-scraping a tool you don't control
13Who approves anything that lets the AI change data or take an action?A named person, and a rule that actions start read-onlyWrite access granted on day one
14What does it do when a connected system is down or slow?It says so and hands over to a personIt guesses, or silently fails

Integration is where large-company projects stall most often (Wing VC, above), and it's usually where the time goes in a build. If the answer to question 12 is "no", that's a project of its own. Our guide to how long it takes to build an AI agent shows where the weeks actually went in our own product.

4. People and ownership (4 questions)

#QuestionA good answer looks likeRed flag
15Who owns the project after launch?One named person with the time and authority to change it"IT" or "the vendor"
16Who reviews what it produces, and how often?A person who reads a sample of outputs every week, at least at firstNobody looks once it's live
17Who picks up what the AI can't handle?A named team, with a target time to respondHandovers go to a shared inbox nobody checks
18Do the people using it understand what it can and can't do?Short training, and a one-page note on its limitsIt's switched on with an announcement email

Question 15 is a deal-breaker. A project without an owner doesn't fail on launch day. It fails three months later, when the content goes stale and nobody's job is to notice.

5. Testing and quality (4 questions)

#QuestionA good answer looks likeRed flag
19Do you have a fixed set of test cases with known right answers?Your 20+ real examples from question 10, saved and re-runnableTesting means "we tried it and it looked fine"
20What score must it reach before it goes live?A number, agreed before the first testThe bar is set after seeing the results
21Who signs off on going live?The owner from question 15, on the test resultsWhoever built it
22Will you re-run the tests when anything changes?Yes: new model, new prompt, new content, new providerTests run once, at launch

Question 22 matters more than it sounds. Model providers retire models on their own timetable. OpenAI removes GPT-4o, GPT-4o mini, GPT-4.1 and GPT-4.1 mini from its API on 14 January 2027 (OpenAI deprecations), and every product built on them has to switch. When we moved ConGreeto to a newer model, we checked it against 22 real cases from two live assistants before switching. That set of cases is what made the switch a decision rather than a gamble. More in our GPT-4o shutdown migration guide.

This is also the second deal-breaker. If you can't test it, you can't tell whether it works, and neither can your vendor.

6. Risk and compliance (5 questions)

#QuestionA good answer looks likeRed flag
23Will people know they're dealing with an AI?Yes, said clearly at the startIt's designed to pass as a person
24Which data protection laws apply, given where your users and servers are?A list: for example GDPR, Saudi Arabia's PDPL, the UAE's data protection law"We're not in the EU, so it doesn't apply"
25Does it make or shape decisions about people: hiring, credit, housing, health?No, or yes and you've checked the rules for that useNobody has asked
26Have you checked the AI-specific rules where you operate?Yes, with a named person responsibleIt's assumed to be the vendor's problem
27Do you know where the data goes: which provider, which country, kept how long?Yes, in writing, from the vendor"The cloud"

What to look up, depending on where you operate:

  • EU. Article 50 of the EU AI Act has required since 2 August 2026 that AI systems talking to people make it clear they're AI, unless that's obvious. We've covered what Article 50 means for chatbots and AI agents. Article 4, on AI literacy for staff, has applied since 2 February 2025 and was amended in 2026 by the Digital Omnibus, so read the current text rather than an older summary. Recruitment and other uses listed in Annex III are high-risk, with much heavier duties: see AI in recruitment and the EU AI Act.
  • UK. UK GDPR was amended in stages during 2026 by the Data (Use and Access) Act 2025, including new rules on automated decisions and cookies from 5 February and a duty to handle data protection complaints from 19 June. See UK GDPR and AI chatbots.
  • Saudi Arabia. The Personal Data Protection Law applies to the personal data an AI system handles: see Saudi PDPL and AI chatbots. In July 2026 SDAIA also launched a national AI risk management framework for government and private entities, covering how to identify, assess, treat and monitor AI risks (Arab News, 14 July 2026).
  • Anywhere. Two voluntary frameworks are worth knowing. The NIST AI Risk Management Framework (released 26 January 2023, with a Generative AI Profile from 26 July 2024, and now being revised) is organised around four functions: Govern, Map, Measure and Manage (NIST). ISO/IEC 42001:2023, published in December 2023, sets out requirements for an AI management system, and organisations can be certified against it (ISO).

This is a checklist, not legal advice. If question 25 is a yes, talk to a lawyer before you build.

7. Cost and operations (4 questions)

#QuestionA good answer looks likeRed flag
28What will one task cost to run, at a realistic worst case?An estimate per conversation or per document, priced at the expensive endOnly the monthly subscription has been costed
29Is there a spending cap, and what happens when it's reached?A cap per day or month, and a defined behaviour (slow down, hand over, alert)Unlimited, "we'll watch it"
30Can you see usage and errors without asking the vendor?Logs or a dashboard someone actually checksYou'll find out from the invoice
31Have you tested that your limits and alerts actually fire?Yes, on purpose, before launchThey exist on paper

Question 31 comes from our own mistake. We found a usage limit in ConGreeto that had never once fired, because the check behind it failed silently every time it ran. Nothing looked wrong until we tested it on purpose. Running costs are easy to underestimate in the other direction too: reasoning models bill their hidden reasoning tokens as output. Our breakdown of what an AI agent actually costs to run shows the arithmetic.

How to score it

Give each answer a number: Yes = 2, Partly = 1, No = 0. The maximum is 62. Then read the result in this order. This is our rule of thumb, not an industry standard.

ResultWhat it meansWhat to do next
Question 15 (owner) or question 19 (test cases) is a NoNot ready, whatever the totalFix those two first. Nothing else is worth funding until they're a Yes
Any section scores under half its maximumReady for a small, low-risk pilot at mostRun a pilot with no write access and a person reviewing every output, while you close the gaps
Every section scores at least half, total 45 or moreReady to buildScope the build against your answers to questions 1, 4 and 20

Two patterns we see a lot:

  • Strong on problem, weak on data. Everyone agrees what to fix, but the information the AI needs is scattered, stale or contradictory. Fix the sources before you build. A model can't be more accurate than what it reads.
  • Strong on technology, weak on people. There's a working demo, but no owner, no reviewer and no handover. This is the project that looks finished in a meeting and quietly dies in production.

A small first project that usually passes

If you're a smaller business, the easiest place to start is a task where the data is already in one place and a mistake is cheap to catch. Answering customer questions from your own website is one. The knowledge is the website, the test cases are the questions customers already ask, and the handover is a lead your team calls back. ConGreeto, our own product, does exactly that, and its guide to lead scoring for small business shows what happens to an enquiry after the chat. Our AI MVP guide covers how to choose a first build more generally.

When you need more than a checklist

A checklist tells you where the gaps are. It doesn't tell you which use case to fund first, or whether to build, buy or have it built. If you want that done with you, our AI readiness assessment is a fixed-scope engagement that covers the same ground in depth and ends with a ranked list of use cases and a 90-day roadmap. If you're already talking to vendors, use our 12 questions to ask an AI development company alongside this list.

FAQ

What is an AI readiness checklist?

An AI readiness checklist is a set of questions you answer before funding an AI project, to check it has what it needs to succeed. This one has 31 questions in seven areas: problem and value, data and knowledge, systems and integration, people and ownership, testing and quality, risk and compliance, and cost and operations.

What should an AI readiness assessment include?

At minimum: the problem and how you'll measure success, the state of the data the AI will use, the systems it must connect to, who owns and reviews it, how it will be tested, the laws that apply, and what it will cost to run. A good assessment also ranks possible use cases by value and feasibility, and says plainly which ones aren't ready.

Is there an AI readiness assessment template?

Yes. The seven tables in this guide work as a template: copy them into a spreadsheet and add columns for your answer (Yes, Partly or No), the evidence and the owner. Score Yes as 2, Partly as 1 and No as 0, and read the result with the scoring table above.

How do I know if my business is ready for AI?

Start with two questions: is there one named person who owns the project after launch, and do you have a set of real test cases with known right answers? If either is a no, you're not ready yet, however good the technology looks. If both are yes, work through the rest of the checklist to find the gaps.

Do small businesses need an AI readiness assessment?

They need the questions more than a formal assessment. A small business usually has one owner, few systems and a short list of possible uses, so the checklist can be done in an afternoon. The deal-breakers are the same at any size: an owner, test cases, and knowing where your data goes.

Which AI readiness framework should I use?

For risk and governance, the NIST AI Risk Management Framework (voluntary, free) and ISO/IEC 42001 (certifiable) are the two most widely referenced. Neither is a project checklist. Use a checklist like this one to decide whether a specific project is ready, and a framework to govern AI across the organisation.